The static test is realized by the Three-Box structure air path switching method, with a maximum impact time of 999 hours and a cycle period of 9999 times. It is equipped with a binary refrigeration system for rapid cooling, and supports automatic cycling or manual selective impact.
The three-box structure is used to achieve static test, the temperature conversion time is ≤ 10 seconds, the temperature recovery is ≤ 5 minutes, the air passage switching mode intRoduces the temperature, and the temperature control accuracy is +/- 0.5 ℃, which is suitable for material thermal expansion and contraction testing.
The three-box structure is used to realize the test area is completely static, the temperature conversion time is ≤ 10 seconds, the Temperature range is -55 ℃~ + 150 ℃, and it has 120 sets of program capacity and real-time Linear dispersion recording function.
Using two-box mobile Impact structure, Thermal Shock mechanism moves within 10 seconds, temperature recovery time ≤ 5 minutes, equipped with rigid polyurethane foam insulation material, effective energy saving and waterproof and moisture proof.
Adopt two-box mobile structure, air pressure drive test object Impact, Thermal Shock mechanism moving time within 10 seconds, temperature recovery time within 5 minutes, in line with MIL and other international test standards.
SUS304 stainless steel inner box and double insulation structure, equipped with 360 degree swirl/spin sample holder and precise ozone concentration control, temperature fluctuation +/- 0.5 ℃, support static dynamic tensile test, suitable for rubber durability research.
The Three-Box structure is used to distinguish the high temperature zone, the low temperature zone and the test zone, and the air passage is switched to achieve temperature impact. The maximum cycle period is 9999 times, and the Temperature range is -60~ 150 ° C. It supports automatic cycle or manual selective impact.
Using Three-Box structure air circuit switching technology, Temperature range covers -60 ° C to 150 ° C, the maximum cycle period is 9999 times, with binary refrigeration system to achieve rapid cooling, support automatic cycle and manual Impact mode.
The two-box mobile structure is adopted, the Thermal Shock mechanism moves within 10 seconds, and the temperature recovery time is within 5 minutes. It is equipped with HFC environmentally friendly refrigerant and binary ultra-low temperature freezing system, which has high cooling speed and efficiency. It supports paperless recording and real-time Linear dispersion display function.
The three-box structure is used to realize the static test sample, the heat storage and cold storage design is combined with the forced air circuit switching, the temperature conversion time is less than or equal to 10 seconds, the temperature control accuracy is +/- 0.5 ℃, and the impact conditions are independently set in the high temperature and low temperature regions.
The three-box structure is used to achieve a completely static test zone, with a temperature conversion time of ≤ 10 seconds and a temperature recovery of ≤ 5 minutes. It has an Impact range of 150 ° C in the high temperature zone and -55 ° C in the low temperature zone, meeting the needs of rapid temperature change testing.
The three-box structure is used to realize the static test sample, the heat storage and cold storage design is matched with the forced air circuit switching, the temperature conversion only takes 10 seconds, and the temperature control accuracy reaches +/- 0.5 ℃, which meets the requirements of continuous testing in extremely high temperature and extremely low temperature environment.
The three-box structure is used to realize the static test sample, the strong cooling hot air circuit switching technology, the temperature conversion time is less than or equal to 10 seconds, the temperature recovery time is less than or equal to 5 minutes, and the temperature control function is independent in the high temperature zone, the low temperature zone and the test zone.
The three-box structure is used to realize the static test sample, the heat storage and cold storage design is matched with the forced air circuit switching, the temperature conversion only takes 10 seconds, and the temperature control accuracy reaches +/- 0.5 ℃, which meets the requirements of continuous testing in extremely high temperature and extremely low temperature environment.
The three-box structure design is adopted, the test sample is still in the test area, the temperature recovery time is ≤ 5min, and the conversion time is ≤ 10s. It has three test functions of high temperature, low temperature and Thermal Shock, meeting a variety of standard requirements.