Thermal Storage High and Low Temperature Test Chamber

The constant temperature high and low temperature test chamber rapidly reaches the set temperature inside the chamber by alternating the operation of heat storage materials and the refrigeration system. It is used to simulate the resistance testing of materials under sudden cooling and heating environments, commonly applied in temperature adaptability verification for electronic components and coating products.
Selection
When selecting, consider that the temperature range should cover the testing requirements, the heating and cooling rates should match the experimental standards, and the workspace size should accommodate the samples to be tested. Pay attention to parameters such as temperature uniformity and fluctuation, confirm the corrosion resistance of the equipment materials, and check whether the safety protection functions are complete.

Terms

Standards

Instruments

Temperature range -40 ℃ to + 150 ℃, the temperature conversion time is only 10 seconds, using PID full digital automatic Control system, can quickly detect the material in the extremely high temperature and low temperature continuous environment resistance and thermal expansion and contraction changes.

$ 17303.00

The three-box structure design is adopted, the test sample is still in the test area, the temperature recovery time is ≤ 5min, and the conversion time is ≤ 10s. It has three test functions of high temperature, low temperature and Thermal Shock, meeting a variety of standard requirements.

$ 21858.00

The three-box heat storage and cold storage structure is adopted, the temperature conversion time is ≤ 10 seconds, and the temperature recovery time is ≤ 5 minutes, which can realize the rapid Impact test of high temperature 150 ℃ to low temperature -55 ℃, and meet the environmental adaptability verification of the extreme temperature of the material.

$ 18437.00

The three-box structure is used to realize the static test sample, the heat storage and cold storage design is matched with the forced air circuit switching, the temperature conversion only takes 10 seconds, and the temperature control accuracy reaches +/- 0.5 ℃, which meets the requirements of continuous testing in extremely high temperature and extremely low temperature environment.

$ 17307.00

Using a two-box mobile Impact structure, the air pressure drives the test object to move up and down, the Thermal Shock mechanism moves within 10 seconds, and the temperature recovery time is within 5 minutes. Equipped with HFC environmentally friendly refrigerant and ultra-low temperature freezing system, the cooling is fast and efficient.

$ 16840.00

Using triple-channel thermal insulation structure, the damper switching time is completed within 10 seconds, and the temperature recovery time is within 5 minutes. With 96 test specification settings, the maximum Impact time is 9999 minutes, meeting the needs of high and low temperature rapid change testing.

$ 27829.00

The three-box structure is used to achieve a completely static test zone, with a temperature conversion time of ≤ 10 seconds and a temperature recovery of ≤ 5 minutes. It has an Impact range of 150 ° C in the high temperature zone and -55 ° C in the low temperature zone, meeting the needs of rapid temperature change testing.

$ 24133.00

The three-box structure is used to realize the static test sample, the strong cooling hot air circuit switching technology, the temperature conversion time is less than or equal to 10 seconds, the temperature recovery time is less than or equal to 5 minutes, and the temperature control function is independent in the high temperature zone, the low temperature zone and the test zone.

$ 15032.00

Adopting a two-box mobile structure, the high temperature zone reaches 150 ° C and the low temperature zone reaches -40 ° C, the conversion time is within 10 seconds, and the recovery time is within 5 minutes. It is equipped with a touch screen controller and rigid polyurethane insulation material.

$ 21406.00

The three-box heat storage and cold storage structure is adopted to achieve rapid temperature conversion of ≤ 10s, and the temperature recovery time is ≤ 5 minutes. It supports Impact testing at 150 ° C in high temperature zone and -40 ° C in low temperature zone, and has program memory and Linear dispersion recording functions.

$ 17307.00

With two-box mobile Impact structure, the temperature recovery time is less than 5 minutes, and the conversion time is only 10 seconds. Equipped with rigid polyurethane foam insulation material, it has ultra-low temperature thermal conductivity and waterproof performance, and supports programmed temperature control.

$ 14564.00

Adopt three-box heat storage and cold storage structure, temperature conversion time ≤ 10 seconds, Temperature range -65 ℃~ + 150 ℃, with independent temperature control functions in high temperature zone, low temperature zone and test zone, and can perform 2-box or 3-box Impact mode.

$ 20261.00

The three-box heat storage structure is used to realize forced air circuit switching, the temperature recovery time is less than or equal to 5 minutes, and the conversion only takes 10 seconds. With independent temperature control in high temperature zone, low temperature zone and test zone, it can perform 2-box or 3-box Impact mode to meet different test needs.

$ 17759.00

The three-box structure is used to realize the static test sample, the heat storage and cold storage design is combined with the forced air circuit switching, the temperature conversion time is less than or equal to 10 seconds, the temperature control accuracy is +/- 0.5 ℃, and the impact conditions are independently set in the high temperature and low temperature regions.

$ 19583.00

Dynamic Impact is achieved with a two-box mobile structure, with a hot and cold conversion time of 10 seconds and a temperature recovery time of 5 minutes. It is equipped with rigid polyurethane foam insulation material, with ultra-low temperature thermal conductivity and multiple safety protection devices.

$ 14564.00

Articles