Overview
CHANGLONG SW-90 (soy sauce) temperature indicator is widely used in the connection part of the bus of the substation. It is used to monitor whether the contact at the bus connection is good. It is an indispensable protective item to ensure the safe operation of the substation. It can supplement the shortcomings of general thermometers. During inspection, the abnormal temperature of the bus is found in time, and corresponding measures are taken to prevent accidents. It can also be used for terminals, isolation switch contacts, transformers, motors, capacitors and other electrical equipment and bearings, bushings and other non-electrical equipment. Measuring temperature and monitoring safe operation.
Features
1. Precision is high, the error between the melting temperature and the rated temperature of the temperature indicator is +/- 1 ℃.
2. Good safety, allowing the melting of the temperature indicator to be observed away from the bus or electrical equipment.
3. Easy to use, simply stick the temperature indicator sheet on the bus or electrical equipment to monitor the temperature.
4. Intuitive, it is clear at a glance whether the temperature indicator is melted on the bus or electrical equipment.
Principle
The temperature indicator film monitors the temperature through its melting characteristics. When the bus or equipment temperature reaches the rated 90 ° C, the temperature indicator film melts, and the temperature abnormality is visually displayed, thus reminding the operator to deal with it in time to prevent accidents.
Applications
Substation bus connection parts, bus and electrical equipment connection terminals, disconnector contacts, transformers, motors, capacitors and other electrical equipment, bearings, bushings and other non-electrical equipment
Steps
1. Paste the temperature indicator sheet on the bus or electrical equipment.
2. Regularly inspect to check whether the temperature indicator is melted.
Notice
- Make sure the temperature plate is firmly attached to avoid peeling.
- Regularly check the status of the temperature gauge and deal with the melting situation in a timely manner.
Verify that the rated temperature matches the equipment requirements before use.