$ 11594.00Ex works
Adopt stainless steel liner and ultra-fine fiberglass insulation, Temperature Uniformity ≤ 2 ℃, support 100 groups of 1000 cycles, with automatic calculation function to improve control accuracy, equipped with multiple safety protection systems.
Category : Temperature Humidity Chamber
Brand : ZKHS
SKU : NB026968
Service :The delivery and service By NBCLab.Com
GDS-010C high and low temperature damping heat test chamber is produced by ZKHS, which is suitable for various performance indicators of aerospace products, information electronic Instruments, materials, electrical and electronic products and various electronic components under high and low temperature or heat and humidity environment inspection. The equipment adopts advanced temperature and humidity control system and refrigeration technology to ensure accurate and stable test environment.
1. The box is processed by numerical control machine tool, which is beautiful and easy to operate 2. The liner adopts imported stainless steel mirror plate, and the shell A3 steel plate is sprayed with plastic, which has high cleanliness 3. Automatic water shortage protection for the replenishment tank, which is convenient for water replenishment 4. Large observation window with lighting, clear observation of the situation in the box 5. The humidification system piping is separated from the control circuit board to improve safety 6. Water system piping circuit door opening, convenient maintenance and repair 7. Ultra-fine fiberglass insulation cotton to avoid energy loss 8. The left side of the box is equipped with a test hole for external test lines 9. Temperature and humidity control instrument 7.0 inch large screen, Chinese and English interface optional 10.100 programs 1000 segments 999 cycle step capacity, flexible time setting 11. Screen lock function to prevent accidental touch shutdown 12. RS-232/RS-485 communication interface, computer remote control 13. Automatic calculation function, accurate and stable temperature and humidity control 14. French original Taikang fully enclosed Compressor, efficient refrigeration 15. Multi-wing blower circulates, with uniform temperature and humidity distribution 16. Independent heating, cooling and humidification system to reduce the failure rate
The equipment realizes low temperature control through the refrigeration system using the French Taikang fully enclosed Compressor, the heating system uses the nickel-chromium alloy electric heater to heat up, the humidification system uses the stainless steel shallow surface evaporative humidifier to increase the humidity, and the dehumidification system reduces the humidity through the evaporator coil dewpoint temperature laminar contact. The multi-wing blower is forced to circulate to ensure the uniform distribution of temperature and humidity in the test area, and the controller automatically calculates and corrects the environment parameters in real time.
Aerospace Products, Information Electronic Instruments, Materials, Electrical and Electronic Products, Various Electronic Components
GB/T10592-2008、GB/T10586-2006、GB/T2423.1-2008、GB/T2423.2-2008、GB/T2423.3-2006、GB/T2423.4-2008、GJB150.3A-2009、GJB150.4A-2009
1. Connect power supply AC220V +/- 10% or AC380V +/- 10% three-phase five-wire system 2. Replenish the water source to the water tank to ensure that the automatic protection function is normal 3. Set the temperature and humidity program through the 7.0-inch Touchscreen, up to 100 groups of 1000 segments 4. Use the RS-232/RS-485 interface to edit programs and monitor on the computer 5. Place the sample in the studio and close the box door to ensure sealing 6. Start the equipment, and the system automatically controls the heating, cooling, and humidification process 7. Linear dispersion monitoring test status through observation window and screen 8. Remove the sample after the test is completed and turn off the power
• Operating Environment Temperature should be kept at 5 ℃~ 30 ℃, humidity ≤ 85% R.H • Regularly check the water level of the replenishment tank to avoid failure due to water shortage • Overhaul waterways and circuit systems through portal opening structure during maintenance • Avoid touching the locked screen to prevent unplanned downtime • The test hole needs to be sealed after use to keep the environment in the box stable • The equipment has multiple protections such as leakage, short circuit, and over-temperature, and can be dealt with in time when there is an abnormality • The refrigeration system is fully enclosed and should not be disassembled by non-professionals • Heating and humidification systems operate independently, paying attention to safety protection
[A] No, it isn't. This is the ex-factory price of the product in the Chinese Mainland. In addition to this price, buyers from different countries need to account for additional costs such as shipping fees, tariffs, and others. For specific regional quotes, please consult our customer service or fill out a quotation form.
[A] First, please click on the quotation form on the website and fill in detailed information. Our customer service personnel will then send you a quotation based on your specific country and region, confirming payment and delivery methods. Following this, we proceed with contract signing, payment, and shipment. You can then await delivery.
[A] After-sales repair for overseas instruments is an unavoidable issue. Our repair terms stipulate that the sender is responsible for the shipping and insurance costs incurred for the repair. Repairs within the warranty period are free, while repair costs beyond the warranty period are determined based on the actual situation.
