Overview
BOZHEN DHG-9123A Benchtop blast drying oven adopts professional numerical control processing equipment to produce, for industrial and mining enterprises, laboratories, R & D institutions such as drying, baking wax melting, sterilizing use.
Features
1. The inside of the box is made of brushed stainless steel argon arc welding, and the outside of the box is made of good steel plate, which is beautiful and novel in appearance.
2. Adopt a microcomputer temperature controller with temperature control protection and digital display, with timing function, accurate and reliable temperature control (optional intelligent LCD program temperature controller).
3. The hot air circulation system is composed of fans and suitable air ducts that can operate continuously at high temperatures, and the temperature in the working room is uniform.
4. Independent temperature limit alarm, automatic interruption when the temperature exceeds the limit, ensuring the safe conduct of the experiment without accidents (optional).
5. With RS485 interface, it can be connected to a recorder and a computer, capable of recording changes in temperature and humidity parameters (optional).
Principle
Precise temperature control by microcomputer temperature controller, combined with hot air circulation system, uniform heating in the working room by high temperature fan and air duct, to achieve drying, baking and other effects.
Applications
Industrial and mining enterprises, laboratories, R & D institutions
Steps
1. Turn on the power supply and set the required temperature and time.
2. Start the equipment and the hot air circulation system starts to work.
3. Monitor the temperature to ensure operation within the set range.
4. After reaching the set time, the device will automatically stop or shut down manually.
Notice
• Ambient Temperature should be in the range of 5~ 40 ℃.
• When the temperature limit is exceeded, the independent temperature limit alarm function will automatically interrupt the operation (optional).
• Power frequency is 220V 50HZ before use.
• Regularly clean and maintain equipment to ensure normal operation.