Please contact customer service
Mechanical binary refrigeration system, temperature control accuracy of +/- 0.01 ℃, equipped with stainless steel humidifier and nickel-chromium alloy heater, support 120 sets of program storage and real-time data recording, to ensure stable and reliable testing.
Category : Temperature Humidity Chamber
Brand : HUDA
SKU : NB041337
Service :The delivery and service By NBCLab.Com
HUDA QT-E702-225B60 programmable humidity chamber is mainly used to simulate the severe high temperature, low temperature or heat and humidity environment that may be encountered during transportation, storage and use of electronic Instruments, new materials, electricians, vehicles, metals, electronic products, aerospace materials, etc.; or under high temperature, low temperature, heat and humidity alternating environment, inspection materials, accessories or instruments are resistant to high temperature, cold, moisture and heat performance and possible damage life reduction.
1. Box structure: the inner box adopts SUS304 #stainless steel plate, the outer box adopts SUS304 #stainless steel plate, equipped with explosion-proof door handle, ultra-fine fiberglass insulation system, fixed PU movable wheel, stainless steel sample holder, test hole and double-decked vacuum reinforced Glass observation window 2. Refrigeration system: using French Taikang Compressor and American DuPont environmental protection refrigerant, binary low temperature circuit system design, P.I.D + S.S.R temperature and humidity control, resolution up to 0.1 ℃ 3. Heating and humidification system: nickel-chromium alloy high-speed heating wire, high temperature completely independent system, stainless steel tube built-in nickel-chromium alloy humidifier, heating and humidification system is completely independent, equipped with automatic water replenishment device 4. Control system: precision LCD programmable temperature controller, smart digital display PID microcomputer temperature control instrument, touch setting, thermal equilibrate temperature control mode, multiple groups of multi-stage programming operation, Chint brand electrical components, USB data transfer interface 5. Protection system: overall equipment overtemperature, fan overheating protection, underphase/inverse phase, refrigeration system overload, refrigeration unit overpressure, timing, leakage, operation instructions, automatic shutdown after fault alarm, etc
The equipment is coordinated by the refrigeration system, the heating system and the humidification system, and adopts the P.I.D + S.S.R system to coordinate the control in the same channel to achieve accurate temperature and humidity adjustment. The refrigeration unit adopts a binary low temperature circuit system design, the heating adopts nickel-chromium alloy heating wire, and the humidification adopts a built-in heating device in a stainless steel tube. Through the thermal equilibrate temperature control method and forced air circulation, various temperature and humidity environmental conditions are simulated.
Electronic Instruments, New Materials, Electrical, Vehicles, Metals, Electronics, Aerospace Materials
GB2423.1-2008/IEC6008-2-1-2007、GB/T 2423.2-2008、GJB150.3A-2009、GJB150.4A-2009、GB2423.22-2008、GBT 2424.5-2006、GB/T 10589-2008、GB/T2423.3-2008(IEC68-2-3)
1. Move the device to the designated position through the bottom PU activity wheel and fix the casters 2. Connect the 380V power supply and check the status of the equipment 3. Set the test parameters through the touch screen, and choose the program method or the setting method 4. Adjust the sample holder spacing and distribute the samples evenly on the sample holder 5. Start the equipment operation and monitor the test process through the observation window 6. After the test is completed, export the test data through the USB interface or SD card 7. Automatic shutdown and alarm when equipment malfunctions
• The load-bearing capacity of the sample should be evenly distributed, and the load-bearing capacity of each sample holder should be ≥ 20kg. • Power supply voltage should be checked before operation • Regularly check the automatic water replenishment device to ensure normal water supply • Equipment failure should be dealt with in time after the alarm • Install thermal insulation accessories and sealing soft plugs in time after the test hole is used • The casters must be fixed after the equipment is moved • Note that the rated current of the device is 18A and the rated power is 9kw when operating.
[A] No, it isn't. This is the ex-factory price of the product in the Chinese Mainland. In addition to this price, buyers from different countries need to account for additional costs such as shipping fees, tariffs, and others. For specific regional quotes, please consult our customer service or fill out a quotation form.
[A] First, please click on the quotation form on the website and fill in detailed information. Our customer service personnel will then send you a quotation based on your specific country and region, confirming payment and delivery methods. Following this, we proceed with contract signing, payment, and shipment. You can then await delivery.
[A] After-sales repair for overseas instruments is an unavoidable issue. Our repair terms stipulate that the sender is responsible for the shipping and insurance costs incurred for the repair. Repairs within the warranty period are free, while repair costs beyond the warranty period are determined based on the actual situation.
