Please contact customer service
Using Three-Box independent throttle switching technology, rapid temperature impact can be achieved without moving the sample, the temperature recovery time is only 5 minutes, the test area Temperature range is -55 ° C to 150 ° C, with 120 sets of program capacity and 9999 commands, and the ability to repeability.
Category : Thermal Shock Test Chamber
Brand : HUDA
SKU : NB041395
Service :The delivery and service By NBCLab.Com
HUDA QD-E703-50KS55 Thermal Shock Test Chamber is suitable for inspection of various performance indicators and mass management of aerospace products, information electronic Instruments, materials, electricians, vehicles, metals, electronic products, various electronic components, wires, cables, etc. in a high and low rapid alternating environment. The equipment adopts a pre-cooling area, a pre-heating area, and a test area Three-Box independent structure to achieve rapid temperature Impact through damper switching without moving the test product.
1. Adopt the independent structure of the pre-cooling area, the pre-heating area, and the test area Three-Box, and achieve rapid temperature Impact through damper switching without moving the test product. 2. Equipped with imported LED digital display microcomputer integrated controller, using human-machine interaction touch input, easy to operate. 3. The program capacity is large, the maximum can be set to 120 groups of programs, and the programs can be linked and used, and each command has the repeability to be executed up to 9999 times. 4. It has three initial impact modes of high temperature, low temperature and room temperature, as well as two or three zone impact functions. 5. With a variety of control functions such as preheating, precooling, program skipping, holding, power-off memory, scheduled start/shutdown, fault diagnosis, etc. 6. Adopt 7-inch LCD color display, support traditional Chinese/English language switching, real-time display of temperature Linear dispersion and running status. 7. Safety protection devices, including Compressor overheating/overcurrent/overpressure protection, adjustable overtemperature protection, phase leakage protection, etc. 8. The refrigeration system adopts European imported low temperature Compressor and environmentally friendly refrigerant to ensure efficient and stable temperature Impact performance.
The equipment is divided into three independent boxes: the pre-cooling area, the pre-heating area and the test area. When Impact is at room temperature, close the damper of the high and low temperature groove, and introduce the Ambient Temperature into the Test space through the blower to eliminate heat or cold. When Impact is at low temperature, close the damper of the high temperature and normal temperature grooves, so that the low temperature groove is connected with the test chamber, and the pre-stored cold capacity is introduced into the test chamber in an instant. When Impact is at high temperature, close the damper of the low temperature and normal temperature grooves, so that the high temperature groove is connected with the test chamber, and the pre-stored heat is introduced into the test chamber in an instant. Through the rapid switching of the damper
Aerospace Products, Information Electronic Instruments, Materials, Electricians, Vehicles, Metals, Electronic Products, Various Electronic Components, Wires, Cables
GJB150.5A-2009 temperature impact test, GB/2423.13-2002 temperature impact test, GJB360B-2009 temperature impact test, GB 2423.1-2 008/IEC6008- 2-1-2007 electrical and electronic products environmental test Part 2: Test methods, Test A: Low temperature, GBT 2423.2-2008 electrical and electronic products environmental test Part 2: Test methods, Test B: High temperature, GBT 10589-2008 low-temperature test chamber technical conditions, GBT 11158-2008 high-temperature test chamber technical conditions
1. Confirm that the equipment installation meets the site requirements (left and right rear side distance wall ≥ 500mm, front ≥ 1000mm), and connect the required power supply (AC380V three-phase, independent control switch). 2. Turn on the total power supply and perform human-machine interaction through the 7-inch Touchscreen controller. 3. Select the program operation mode (Automatic Cycle Impact or Manual Selective Impact) as required, and set relevant parameters (such as Temperature range, time, number of cycles, etc.). 4. Execute program editing, linking, skipping, holding and other operations, and back up parameters or record data through a U disk. 5. Start the program, and the equipment will automatically perform the preheating, precooling and temperature impact processes according to the settings. 6. During operation, the temperature setting value, actual value, program segment number, remaining time, operation status and Linear dispersion can be monitored in real time through the screen. 7. When the program is completed or needs to be interrupted, shut down according to the procedures. With appointment start and shutdown functions.
* Equipment Operating Environment Temperature should be kept within 0 ℃~ + 35 ℃, relative humidity ≤ 85%. Ambient Temperature should be kept within 0 ℃~ + 45 ℃; if Ambient Temperature is below 0 ℃ and the equipment is stopped for a long time, the water left in the equipment must be drained to prevent the pipeline from freezing and damage. * When installing, the distance between the left and right side panels of the test chamber and the rear side panels shall not be less than 500mm, and the distance between the front and the wall shall not be less than 1000mm. * Ensure that the power supply conditions are AC380V three-phase, the allowable voltage fluctuation range is +/- 10%, the Frequency is 50 +/- 0.5Hz, and the air or power switch is equipped with independent control. The equipment needs to be grounded reliably, and the grounding resistance of the protective ground wire should be less than 4Ω. * Before running, please confirm that the auxiliary system such as the chilled down water tower (if purchased) is working properly. * Pay attention to the status of the safety protection device of the equipment, and the fault alarm needs to be investigated and dealt with according to the prompts. * The load-bearing material of the test should be ≤ 20kg/piece (standard rack). Controllers and precision components need to be protected from impact and moisture.
[A] No, it isn't. This is the ex-factory price of the product in the Chinese Mainland. In addition to this price, buyers from different countries need to account for additional costs such as shipping fees, tariffs, and others. For specific regional quotes, please consult our customer service or fill out a quotation form.
[A] First, please click on the quotation form on the website and fill in detailed information. Our customer service personnel will then send you a quotation based on your specific country and region, confirming payment and delivery methods. Following this, we proceed with contract signing, payment, and shipment. You can then await delivery.
[A] After-sales repair for overseas instruments is an unavoidable issue. Our repair terms stipulate that the sender is responsible for the shipping and insurance costs incurred for the repair. Repairs within the warranty period are free, while repair costs beyond the warranty period are determined based on the actual situation.
