Please contact customer service
With Three-Box independent damper switching technology, fast temperature impact is achieved without moving the sample. Temperature recovery time is only 5 minutes, the test range is -70 ° C to 170 ° C, with 120 program capacity and Touchscreen control.
Category : Thermal Shock Test Chamber
Brand : HUDA
SKU : NB041406
Service :The delivery and service By NBCLab.Com
HUDA QD-E703-100KS55 Thermal Shock Test Chamber is suitable for inspection of various performance indicators and mass management of aerospace products, information electronic Instruments, materials, electricians, vehicles, metals, electronic products, various electronic components, wires, cables, etc. in a high and low rapid alternating environment. The equipment adopts three independent designs of pre-cooling area, pre-heating area and test area, and realizes fast temperature Impact through damper switching.
1. Adopt Three-Chamber independent structure (pre-cooling zone, pre-heating zone, test zone) to achieve rapid temperature Impact through damper switching, without moving the test product. 2. Equipped with imported LED digital display microcomputer integrated controller, using touch human-machine interaction interface, easy to operate. 3. Large program capacity, can store up to 120 sets of programs, each command can be repeability up to 9999 times, and can be used in conjunction between programs. 4. Equipped with a variety of control functions, including high temperature/low temperature/normal temperature start, preheating and precooling, program jump hold, PID parameter setting, power-off memory continuation, appointment start-stop, fault recording, etc. 5. Adopt binary compound refrigeration system, the core components such as Compressor (France Taikang), controller (Taiwan Youyi), Sensor (Taiwan Songyang) and other brand accessories. 6. Safety protection devices, including Compressor overheating/overcurrent/overvoltage protection, adjustable overtemperature protection, power phase sequence phase loss protection, leakage protection, etc. 7. Provide RS-485 Communication interface and U disk storage function for data recording, Linear dispersion viewing and remote monitoring.
The equipment is divided into three independent boxes: the pre-cooling area, the pre-heating area and the test area. When Impact is at room temperature, close the damper of the high and low temperature groove, and introduce the Ambient Temperature into the Test space through the blower. When Impact is at low temperature, close the damper of the high temperature and normal temperature grooves, so that the low temperature groove is connected with the test chamber, and the pre-stored cold capacity is instantly introduced into the test chamber. When Impact is at high temperature, close the damper of the low temperature and normal temperature grooves, so that the high temperature groove is connected with the test chamber, and the pre-stored heat is instantly introduced into the test chamber. Through the rapid switching of the damper, the rapid exchange of the Ambient Temperature
Aerospace Products, Information Electronic Instruments, Materials, Electricians, Vehicles, Metals, Electronic Products, Various Electronic Components, Wires, Cables
GJB150.5A-2009 temperature impact test, GB/2423.13-2002 temperature impact test, GJB360B-2009 temperature impact test, GB 2423.1-2 008/IEC6008- 2-1-2007 electrical and electronic products environmental test Part 2: Test methods, Test A: Low temperature, GBT 2423.2-2008 electrical and electronic products environmental test Part 2: Test methods, Test B: High temperature, GBT 10589-2008 low-temperature test chamber technical conditions, GBT 11158-2008 high-temperature test chamber technical conditions
1. Confirm that the equipment installation site meets the requirements (left and right rear side distance from the wall ≥ 500mm, front ≥ 1000mm), and connect the required power supply (AC380V three-phase, independent control switch). 2. Turn on the main power switch and observe whether the power indicator light is normal. 3. Select Operating language (Chinese/English) on the Touchscreen controller to perform basic settings such as date and time. 4. According to the test requirements, edit or call the existing test program to set parameters such as temperature Impact range, time, and number of cycles. 5. Place the sample to be tested on the stainless steel material rack in the test chamber (load-bearing ≤ 20kg/piece). 6. Select the starting mode (high temperature/low temperature/normal temperature start) and start the test program. 7. During the test process, the temperature Linear dispersion, program segment, remaining time and other information can be monitored in real time through Touchscreen. 8. After the test is completed, the device automatically stops and the sample is taken out. 9. Test data can be exported through a U disk or connected to a computer through an RS-485 interface for data management. 10. If the Ambient Temperature may be lower than 0 ° C, it is necessary to empty the equipment to store water.
* Environmental requirements: Equipment Ambient Temperature should be kept within 0 ℃~ + 35 ℃, relative humidity ≤ 85%. * Environmental requirements: Ambient Temperature of equipment should be kept within 0 ° C~ + 45 ° C; when Ambient Temperature is lower than 0 ° C and the equipment is stopped for a long time, the water retained in the equipment must be drained clean to prevent pipe icing damage. * Installation space requirements: the distance between the left and right sides of the test chamber and the rear wall panels shall not be less than 500mm, and the distance between the front and the wall shall not be less than 1000mm. * power requirements: The power supply condition is AC380V three-phase, and the corresponding capacity needs to be configured and the air or power switch of this equipment is independently controlled. Attention: Before the equipment is running, it is necessary to confirm the size of the entrance, passage, elevator, etc., to ensure that the equipment can enter the installation position smoothly. * Operation Note: Before testing, please confirm that the weight of the sample does not exceed the load-bearing capacity of the material rack (each piece ≤ 20kg). Safety precautions: When the equipment is running, do not open and close the box door frequently, and pay attention to various indicator lights and alarm messages. * Maintenance Note: Regularly check the chilling down system (such as purchasing a chilling down tower, ensure that the water Flow rate is 8 tons/hour) and the refrigerant status.
[A] No, it isn't. This is the ex-factory price of the product in the Chinese Mainland. In addition to this price, buyers from different countries need to account for additional costs such as shipping fees, tariffs, and others. For specific regional quotes, please consult our customer service or fill out a quotation form.
[A] First, please click on the quotation form on the website and fill in detailed information. Our customer service personnel will then send you a quotation based on your specific country and region, confirming payment and delivery methods. Following this, we proceed with contract signing, payment, and shipment. You can then await delivery.
[A] After-sales repair for overseas instruments is an unavoidable issue. Our repair terms stipulate that the sender is responsible for the shipping and insurance costs incurred for the repair. Repairs within the warranty period are free, while repair costs beyond the warranty period are determined based on the actual situation.