Overview
The CBGL-850B electric air blowing dryer adopts a novel vertical design, and the shell is treated by high-quality steel plate electrostatic spraying process, which is beautiful and durable. The studio is made of stainless steel and has been treated with anti-corrosion treatment, with four corners of circular arc transition, adjustable Shelf spacing, and the air duct side panel and bottom heating cover are quick-release structures for easy cleaning. The box door adopts a new structure with good heat insulation effect. It is equipped with double-decked tempered Glass large viewing window, lock-type elastic adjustment door lock and high temperature resistant silicone sealing strip to ensure good sealing to prevent heat loss.
Features
1. High Accuracy, Large Capacity, Efficient, Safe and Wide Range.
2. PID temperature controller and microcomputer temperature control, accurate temperature control.
3. Dedicated function keys to achieve temperature setting.
4. Auxiliary menu supports over-rise alarm, deviation correction and menu lock.
5. Operation functions include timing operation, temperature deviation correction, menu lock and power failure memory.
6. Optional 485 interface, printer and programmable temperature controller.
7. Equipped with independent temperature limit, over-temperature alarm and power-off safety device.
Principle
Electric air blowing dryer through the fan cycle to achieve thermostatic, stainless steel heating pipe heating, PID temperature control instrument and microcomputer precise control of temperature, to ensure that the temperature is stable within the set range. The box structure design optimizes heat distribution and prevents heat loss.
Applications
Industrial drying, laboratory heating, material handling, sample drying
Steps
1. Use the dedicated function keys to set the temperature.
2. Through the auxiliary menu for over-rise alarm, deviation correction or menu lock settings.
3. Set the scheduled running time (0-9999 minutes).
4. Start the device and monitor the LCD display temperature.
5. Clean the air duct side plate and bottom heating cover after use.
Notice
• Make sure the power supply is 380V 50HZ.
• Temperature range is RT + 10-300 ℃ to avoid exceeding the limit.
• Shelf load-bearing no more than 25KG.
• Regularly check the sealing strip and heating pipe status.
• Pay attention to over-temperature alarm and power failure safety functions.
• Utilize a quick-release structure when cleaning.