Overview
This series of direct-connected rotary vane Vacuumpump is suitable for pumping air and other general gases. It adopts an oil pump forced oil inlet device and can still operate continuously when the pressure of the air inlet is less than or equal to 1.33x10 ^ 3. It can be used alone or as a pre-pump for booster pump, diffusion pump, molecular pump, maintenance pump, titanium pump, and is widely used in vacuum metallurgy, vacuum coating, vacuum drying, freeze drying, vacuum degassing, vacuum Encasement, Vacuum chuck, vacuum forming, food Encasement, printing, sputtering, vacuum casting, photovoltaic, aviation technology, chemical industry, electronics, refrigerator, air conditioning assembly line and laboratory and other vacuum operations and supporting use.
Features
1. Formulate a specially designed gas ballast valve to prevent the pump oil from mixing with water and prolong the service time of the pump oil
2. High extraction efficiency, Ultimate vacuum degree, Long service life
3. Equipped with an automatic anti-return oil check valve, no oil return
4. Can be equipped with small diameter adapter, KF interface, flange interface
5. When the suction contains steam, particles, corrosive gases, in the pump inlet to install auxiliary equipment, such as condenser, dust collector, etc
Principle
The pump adopts a direct-coupled rotary vane design, and realizes continuous operation through the forced oil inlet device of the oil pump, which is suitable for pumping air and general gases.
Applications
Lyophilizer, Rotary evaporator, vacuum dryer, cleaning machine, centrifugal condenser, glove box, tubular furnace, double row tube, suctionfiltration, coating, sputtering equipment, various high vacuum pre-pump
Steps
1. Check whether the pump body and connecting parts are in good condition
Connect the power supply (220V) and ensure voltage stability
3. Install auxiliary equipment as needed (e.g. install condenser or dust collector when pumping steam, particles, corrosive gases)
4. Start the pump and monitor the operating status
5. Turn off the power after use and perform daily maintenance
Notice
• When pumping gases containing vapors, particles, and corrosive gases, auxiliary equipment such as condensers or dust collectors must be installed at the air inlet
• Ensure that the working voltage is 220V to avoid overload operation
• Regularly check the pump oil status to prevent water mixing to prolong the service life
• Pay attention to noise control, the noise value of this product is 63dB (A)
• Timely cleaning and maintenance after use to ensure long-term stable operation