The three-box heat storage structure is used to realize forced air circuit switching, the temperature recovery time is less than or equal to 5 minutes, and the conversion only takes 10 seconds. With independent temperature control in high temperature zone, low temperature zone and test zone, it can perform 2-box or 3-box Impact mode to meet different test needs.
Using two-box mobile Impact structure, Thermal Shock mechanism moves within 10 seconds, temperature recovery time ≤ 5 minutes, equipped with rigid polyurethane foam insulation material, effective energy saving and waterproof and moisture proof.
Adopt two-box mobile structure, air pressure drive test object Impact, Thermal Shock mechanism moving time within 10 seconds, temperature recovery time within 5 minutes, in line with MIL and other international test standards.
The two-box mobile structure is adopted, the Thermal Shock mechanism moves within 10 seconds, and the temperature recovery time is within 5 minutes. It is equipped with HFC environmentally friendly refrigerant and binary ultra-low temperature freezing system, which has high cooling speed and efficiency. It supports paperless recording and real-time Linear dispersion display function.
The three-box structure design is adopted, the test sample is still in the test area, the temperature recovery time is ≤ 5min, and the conversion time is ≤ 10s. It has three test functions of high temperature, low temperature and Thermal Shock, meeting a variety of standard requirements.
Using three-box equipment structure, the temperature conversion time does not exceed 10 seconds, the temperature control accuracy reaches +/- 0.5 ℃, and the air circuit switching method realizes fast Thermal Shock, which is suitable for material physical and chemical change testing.
The three-box heat storage and cold storage structure is adopted to achieve rapid temperature conversion of ≤ 10s, and the temperature recovery time is ≤ 5 minutes. It supports Impact testing at 150 ° C in high temperature zone and -40 ° C in low temperature zone, and has program memory and Linear dispersion recording functions.
Two-box mobile structure, air pressure driven test object Impact, Thermal Shock mechanism moving time within 10 seconds, temperature recovery time within 5 minutes, in line with MIL, IEC and other specifications, with paperless recording and real-time Linear dispersion display function.
The three-box structure is used to realize the static test sample, the heat storage and cold storage design is combined with the forced air circuit switching, the temperature conversion time is less than or equal to 10 seconds, the temperature control accuracy is +/- 0.5 ℃, and the impact conditions are independently set in the high temperature and low temperature regions.
Adopt three-box heat storage and cold storage structure, temperature conversion time ≤ 10 seconds, Temperature range -65 ℃~ + 150 ℃, with independent temperature control functions in high temperature zone, low temperature zone and test zone, and can perform 2-box or 3-box Impact mode.
The three-box heat storage and cold storage structure is adopted, the temperature conversion time is ≤ 10 seconds, and the temperature recovery time is ≤ 5 minutes, which can realize the rapid Impact test of high temperature 150 ℃ to low temperature -55 ℃, and meet the environmental adaptability verification of the extreme temperature of the material.
The three-box structure is used to realize the static test sample, the heat storage and cold storage design is matched with the forced air circuit switching, the temperature conversion only takes 10 seconds, and the temperature control accuracy reaches +/- 0.5 ℃, which meets the requirements of continuous testing in extremely high temperature and extremely low temperature environment.
The three-box structure is used to realize the static test sample, the heat storage and cold storage design is matched with the forced air circuit switching, the temperature conversion only takes 10 seconds, and the temperature control accuracy reaches +/- 0.5 ℃, which meets the requirements of continuous testing in extremely high temperature and extremely low temperature environment.
Using a two-box mobile Impact structure, the air pressure drives the test object to move up and down, the Thermal Shock mechanism moves within 10 seconds, and the temperature recovery time is within 5 minutes. Equipped with HFC environmentally friendly refrigerant and ultra-low temperature freezing system, the cooling is fast and efficient.
With three-box structure design, the temperature conversion time is only 10 seconds, the temperature control accuracy is up to +/- 0.5 ℃, and it is equipped with touch graphic operation interface and air passage switching system to achieve fast and stable Thermal Shock testing.