$ 11079.00Ex works
Using 7.0 inch Touchscreen controller, high temperature and humidity control accuracy, Temperature Fluctuation ≤ +/- 0.5 ℃, humidity deviation + 2, -3% R.H, with multi-wing air supply cycle to ensure uniform distribution, improve test reliability.
Category : High Low Temperature Test Chamber
Brand : ZKHS
SKU : NB026918
Service :The delivery and service By NBCLab.Com
GDJS-800B high and low temperature alternating damping heat test chamber is produced by ZKHS, suitable for aerospace products, information electronic Instruments, materials, electrical, electronic products and various electronic components in high and low temperature or heat and humidity environment inspection of its performance indicators. The equipment adopts advanced structural design and control system to ensure stable and reliable test environment.
1. The box body is processed and formed by numerical control machine tool, which is beautiful and easy to operate. 2. The liner is imported stainless steel (SUS304) mirror plate, and the shell is sprayed with A3 steel plate, which has high cleanliness. 3. The replenishment tank has automatic water shortage protection, which is convenient for water replenishment. 4. Large observation window with lighting, clear observation of the situation inside the box. 5. The humidification system piping is separated from the control circuit board to enhance safety. 6. Waterways and circuit systems are door-opened for easy maintenance and repair. 7. The box body insulation adopts ultra-fine fiberglass insulation cotton to reduce energy loss. 8. The left side of the box is equipped with a test hole for external test lines. 9. The temperature and humidity control instrument is a 7.0-inch large screen, which supports Chinese and English interfaces and real-time Linear dispersion display. 10. The controller has a capacity of 100 programs and 1000 segments of 999 cycle steps, and supports screen locking and RS-232/RS-485 communication. 11. Automatic calculation function corrects temperature and humidity changes for accurate and stable control. 12. The refrigerator adopts the original French "Taikang" fully enclosed Compressor, and the refrigeration system is a unit or binary low temperature circuit design. 13. Multi-wing blower with strong air supply circulation, uniform temperature and humidity distribution, wind pressure and wind speed meet standards. 14. The heating, cooling, and humidification systems are independent, reducing test costs and failure rates.
The test chamber simulates high and low temperature or heating and humidity environment through temperature and humidity control system, uses refrigeration system to achieve cooling, heating system to achieve heating, humidification system to adjust humidity, and ensures uniform distribution of temperature and humidity in the test area through air circuit circulation system. The controller automatically calculates and corrects temperature and humidity changes to maintain a stable environment.
Aerospace Products, Information Electronic Instruments, Materials, Electrical, Electronic Products, Various Electronic Components
GB/T10592-2008、GB/T10586-2006、GB/T2423.1-2008、GB/T2423.2-2008、GB/T2423.3-2006、GB/T2423.4-2008、GJB150.3A-2009、GJB150.4A-2009
Connect the power supply to ensure that the voltage meets the requirements of AC220V +/- 10% 50Hz or AC380V +/- 10% 50Hz three-phase five-wire system. 2. Open the control instrument, select the Chinese and English interface, and edit or select the test program. 3. Set temperature and humidity parameters, such as temperature range -20~ 150 ℃, humidity range 30~ 98% R.H. 4. Start the equipment and monitor the real-time operation of Linear dispersion to ensure stable temperature and humidity. 5. After the test is completed, turn off the device and disconnect the power.
• Operating Environment Temperature should be 5 ℃~ 30 ℃, humidity ≤ 85% R.H. • Avoid touching the controller screen artificially to prevent accidental shutdown. • Regularly check the replenishment tank to ensure that the water source is sufficient and avoid triggering water shortage protection. • Pay attention to the safety of waterways and circuit systems during maintenance, and follow the door opening operation. • The test hole is closed in time after use to prevent energy loss. • Do not open the door frequently when the equipment is running, so as not to affect the stability of temperature and humidity. • Pay attention to safety protection functions, such as leakage, short circuit, over temperature, etc., and deal with abnormalities immediately.
[A] No, it isn't. This is the ex-factory price of the product in the Chinese Mainland. In addition to this price, buyers from different countries need to account for additional costs such as shipping fees, tariffs, and others. For specific regional quotes, please consult our customer service or fill out a quotation form.
[A] First, please click on the quotation form on the website and fill in detailed information. Our customer service personnel will then send you a quotation based on your specific country and region, confirming payment and delivery methods. Following this, we proceed with contract signing, payment, and shipment. You can then await delivery.
[A] After-sales repair for overseas instruments is an unavoidable issue. Our repair terms stipulate that the sender is responsible for the shipping and insurance costs incurred for the repair. Repairs within the warranty period are free, while repair costs beyond the warranty period are determined based on the actual situation.
