$ 15210.00Ex works
Using multi-channel mechanical compression refrigeration system and frequency conversion technology, energy consumption is reduced by 20%; with a linear temperature rise and fall rate of 15 ° C/min, Temperature Uniformity ≤ 2 ° C; through forced air duct system and special PID algorithm to achieve rapid temperature convergence and stability control.
Category : High Low Temperature Test Chamber
Brand : HUDA
SKU : NB041421
Service :The delivery and service By NBCLab.Com
HUDA QD-E708-150K40-X15 rapid temperature change test chamber is a professional equipment used to determine the adaptability of electronic products, automotive parts, materials, etc. under the conditions of high humidity, low humidity, constant heat and humidity, high and low temperature rapid alternating cycle, surface condensation heat and humidity. The equipment adopts reasonable structure and stable and reliable Control mode, with beautiful appearance, easy operation, safety, high temperature and humidity control accuracy, suitable for rapid temperature change test, constant temperature and humidity test, alternating humidity cabinet test.
1. Adopt multi-channel environmental protection and energy-saving mechanical compression refrigeration system, energy consumption only accounts for 80% of congeneric products, equipped with frequency conversion technology and sound absorption and silencing design 2. Self-developed multi-channel multi-stage throttling system to ensure adjustable flow, uniform temperature field, and minimal fluctuations 3, the application of broadband compression equilibrating temperature control system, through PID adaptive algorithm to achieve rapid temperature convergence control 4. Configure the man-machine management interface and RS485 communication to support remote visual control and graphical fault diagnosis
The equipment adaptively adjusts the refrigeration output according to the working conditions through a multi-channel mechanical compression refrigeration system and a multi-stage throttling system; uses a temperature adjustment chamber, a static pressure chamber, and a centrifugal fan blade forced air duct system to ensure that hot and cold are fully exchanged and evenly sent to the studio; uses a PID adaptive algorithm to correct the control parameters in real time to achieve rapid temperature convergence and stable control.
Electronics, automotive parts, materials
GB2423.1-2008/IEC6008-2-1-2007、GB/T 2423.2-2008、GJB150.3A-2009、GJB150.4A-2009、GB2423.22-2008、GBT 2424.5-2006、GB/T 10589-2008、GB/T2423.3-2008(IEC68-2-3)、GJB150.9A-2009、G/BT 2423.4-2008/IEC6008-2-30:2005、GB/T5170.18-2005、GB/T10586-2006、GBT 2424.6-2006、GBT 2424.7-2006
1. Connect the power supply and ensure that the power supply meets the requirements of AC380V three-phase four-wire system 2. Set the temperature and humidity program or select the setting mode through the touch screen 3. Start the equipment, and the system automatically performs operations such as refrigeration, heating, and humidification 4. Monitor the running status, and remotely observe the data through the RS485 interface 5. After the test is completed, the equipment will automatically stop or end according to the set program
• The installation site needs to be flat, well ventilated, and free of flammable and explosive corrosive gases • The surrounding maintenance space is not less than A: 400mm, B: 400mm, C: 1000mm • Power supply voltage allowable fluctuation range of 10%, frequency 50 +/- 0.5Hz • The grounding resistance of the protective ground wire should be less than 4Ω. • The water quality of the water supply must meet the second-level water use standard of the National Analytical Laboratory • Working environment temperature 5~ 30 ℃, humidity ≤ 85% R.H • Pay attention to the status of over-temperature, over-current, and lack of protection devices when the equipment is running
[A] No, it isn't. This is the ex-factory price of the product in the Chinese Mainland. In addition to this price, buyers from different countries need to account for additional costs such as shipping fees, tariffs, and others. For specific regional quotes, please consult our customer service or fill out a quotation form.
[A] First, please click on the quotation form on the website and fill in detailed information. Our customer service personnel will then send you a quotation based on your specific country and region, confirming payment and delivery methods. Following this, we proceed with contract signing, payment, and shipment. You can then await delivery.
[A] After-sales repair for overseas instruments is an unavoidable issue. Our repair terms stipulate that the sender is responsible for the shipping and insurance costs incurred for the repair. Repairs within the warranty period are free, while repair costs beyond the warranty period are determined based on the actual situation.
