The two-box mobile structure is adopted, the Thermal Shock mechanism moves within 10 seconds, and the temperature recovery time is within 5 minutes. It is equipped with HFC environmentally friendly refrigerant and binary ultra-low temperature freezing system, which has high cooling speed and efficiency. It supports paperless recording and real-time Linear dispersion display function.
The three-box structure design is adopted, the test sample is still in the test area, the temperature recovery time is ≤ 5min, and the conversion time is ≤ 10s. It has three test functions of high temperature, low temperature and Thermal Shock, meeting a variety of standard requirements.
Using two-box mobile Impact structure, Thermal Shock mechanism moves within 10 seconds, temperature recovery time ≤ 5 minutes, equipped with rigid polyurethane foam insulation material, effective energy saving and waterproof and moisture proof.
Adopt two-box mobile structure, air pressure drive test object Impact, Thermal Shock mechanism moving time within 10 seconds, temperature recovery time within 5 minutes, in line with MIL and other international test standards.
Using three-box equipment structure, the temperature conversion time does not exceed 10 seconds, the temperature control accuracy reaches +/- 0.5 ℃, and the air circuit switching method realizes fast Thermal Shock, which is suitable for material physical and chemical change testing.
With three-box structure design, the temperature conversion time is only 10 seconds, the temperature control accuracy is up to +/- 0.5 ℃, and it is equipped with touch graphic operation interface and air passage switching system to achieve fast and stable Thermal Shock testing.
The three-box structure design is adopted, the temperature conversion time does not exceed 10 seconds, the temperature control accuracy is up to +/- 0.5 ℃, the Thermal Shock test is realized through the air circuit switching, and the touch graphic operation interface is equipped to simplify the operation process.
Adopting a three-box structure design, the temperature recovery time does not exceed 5 minutes, and the temperature conversion is completed within 10 seconds. It is equipped with a touch-sensitive graphic operation interface and an air path switching system to achieve fast and stable Thermal Shock testing.
Using a two-box mobile Impact structure, the air pressure drives the test object to move up and down, the Thermal Shock mechanism moves within 10 seconds, and the temperature recovery time is within 5 minutes. Equipped with HFC environmentally friendly refrigerant and ultra-low temperature freezing system, the cooling is fast and efficient.
Two-box mobile structure, air pressure driven test object Impact, Thermal Shock mechanism moving time within 10 seconds, temperature recovery time within 5 minutes, in line with MIL, IEC and other specifications, with paperless recording and real-time Linear dispersion display function.
Temperature range -40 ℃ to + 150 ℃, the temperature conversion time is only 10 seconds, using PID full digital automatic Control system, can quickly detect the material in the extremely high temperature and low temperature continuous environment resistance and thermal expansion and contraction changes.
The three-box structure is used to achieve independent temperature control in the high temperature zone, low temperature zone and test zone, with a temperature conversion time of less than or equal to 10 seconds. It is equipped with rigid polyurethane foam insulation materials and supports 2 or 3 boxes of Impact mode to meet different standard testing requirements.
Adopting an independent control structure of a cold and hot box, the temperature conversion time is less than or equal to 15 seconds, the temperature recovery time is less than or equal to 5 minutes, and it has the ability to accurately control the temperature in the sample area with a temperature fluctuation of less than or equal to +/- 0.5 ° C, supporting an adjustable test time of 9999 hours.
The three-box heat storage and cold storage structure is adopted to achieve rapid temperature conversion of ≤ 10s, and the temperature recovery time is ≤ 5 minutes. It supports Impact testing at 150 ° C in high temperature zone and -40 ° C in low temperature zone, and has program memory and Linear dispersion recording functions.
The temperature conversion time only takes 15 seconds, the recovery time does not exceed 5 minutes, equipped with a 7-inch Touchscreen controller, with an accuracy of +/- 0.1 ° C, and an independent cold and hot box design to improve test efficiency and safety.