Adopt three-box heat storage and cold storage structure, temperature conversion time ≤ 10 seconds, Temperature range -65 ℃~ + 150 ℃, with independent temperature control functions in high temperature zone, low temperature zone and test zone, and can perform 2-box or 3-box Impact mode.
The three-box heat storage and cold storage structure is adopted to achieve rapid temperature conversion of ≤ 10s, and the temperature recovery time is ≤ 5 minutes. It supports Impact testing at 150 ° C in high temperature zone and -40 ° C in low temperature zone, and has program memory and Linear dispersion recording functions.
The three-box structure is used to realize the static test sample, the heat storage and cold storage design is combined with the forced air circuit switching, the temperature conversion time is less than or equal to 10 seconds, the temperature control accuracy is +/- 0.5 ℃, and the impact conditions are independently set in the high temperature and low temperature regions.
The three-box heat storage and cold storage structure is adopted, the temperature conversion time is ≤ 10 seconds, and the temperature recovery time is ≤ 5 minutes, which can realize the rapid Impact test of high temperature 150 ℃ to low temperature -55 ℃, and meet the environmental adaptability verification of the extreme temperature of the material.
The three-box structure realizes independent temperature control in the high temperature and low temperature area, the temperature conversion time is ≤ 10 seconds, the temperature control accuracy is +/- 0.5 ℃, the air circuit switching Impact mode is adopted, and the microcomputer equilibrating temperature control system is equipped.
With two-box mobile Impact structure, the temperature recovery time is less than 5 minutes, and the conversion time is only 10 seconds. Equipped with rigid polyurethane foam insulation material, it has ultra-low temperature thermal conductivity and waterproof performance, and supports programmed temperature control.
Dynamic impact testing is achieved with a two-box mobile structure. The impact conversion time is within 10 seconds, and the temperature recovery time is within 5 minutes. It is equipped with rigid polyurethane foam insulation materials to ensure low thermal conductivity and meet a number of national standards.
The independent control structure of the cold and hot box is adopted, with a temperature conversion time of less than 15 seconds and a temperature recovery time of less than 5 minutes. It is equipped with multiple safety interlock protection and standard lead hole design to ensure efficient and safe testing.
Using a two-box mobile Impact structure, the air pressure drives the test object to move up and down, the Thermal Shock mechanism moves within 10 seconds, and the temperature recovery time is within 5 minutes. Equipped with HFC environmentally friendly refrigerant and ultra-low temperature freezing system, the cooling is fast and efficient.
The three-box structure design is adopted, the test sample is still in the test area, the temperature recovery time is ≤ 5min, and the conversion time is ≤ 10s. It has three test functions of high temperature, low temperature and Thermal Shock, meeting a variety of standard requirements.
The three-box structure is used to realize the static test sample, the heat storage and cold storage design is matched with the forced air circuit switching, the temperature conversion only takes 10 seconds, and the temperature control accuracy reaches +/- 0.5 ℃, which meets the requirements of continuous testing in extremely high temperature and extremely low temperature environment.
Using triple-channel thermal insulation structure, the damper switching time is completed within 10 seconds, and the temperature recovery time is within 5 minutes. With 96 test specification settings, the maximum Impact time is 9999 minutes, meeting the needs of high and low temperature rapid change testing.
The three-box structure is used to achieve a completely static test zone, with a temperature conversion time of ≤ 10 seconds and a temperature recovery of ≤ 5 minutes. It has an Impact range of 150 ° C in the high temperature zone and -55 ° C in the low temperature zone, meeting the needs of rapid temperature change testing.
Adopt three-box structure to achieve rapid temperature conversion, conversion time ≤ 10 seconds, temperature control accuracy of +/- 0.5 ℃, equipped with air passage switching system and microcomputer equilibrate temperature control system to ensure test Stability.
Adopting triple-channel thermal insulation structure, the throttle switching time is completed within 10 seconds, and the temperature recovery time is completed within 5 minutes. With 96 test specification settings, the Impact time can reach 9999 minutes, and the cycle period is 9999 times, meeting the needs of High Accuracy Temperature Control.