The three-box structure design is adopted, the test sample is still in the test area, the temperature recovery time is ≤ 5min, and the conversion time is ≤ 10s. It has three test functions of high temperature, low temperature and Thermal Shock, meeting a variety of standard requirements.
Using a two-box mobile Impact structure, the air pressure drives the test object to move up and down, the Thermal Shock mechanism moves within 10 seconds, and the temperature recovery time is within 5 minutes. Equipped with HFC environmentally friendly refrigerant and ultra-low temperature freezing system, the cooling is fast and efficient.
With three-box structure design, the temperature conversion time is only 10 seconds, the temperature control accuracy is up to +/- 0.5 ℃, and it is equipped with touch graphic operation interface and air passage switching system to achieve fast and stable Thermal Shock testing.
The three-box structure is used to realize the static test sample, the heat storage and cold storage design is matched with the forced air circuit switching, the temperature conversion only takes 10 seconds, and the temperature control accuracy reaches +/- 0.5 ℃, which meets the requirements of continuous testing in extremely high temperature and extremely low temperature environment.
The three-box structure realizes independent temperature control in the high temperature and low temperature area, the temperature conversion time is ≤ 10 seconds, the temperature control accuracy is +/- 0.5 ℃, the air circuit switching Impact mode is adopted, and the microcomputer equilibrating temperature control system is equipped.
The two-box mobile structure is adopted, the Thermal Shock mechanism moves within 10 seconds, and the temperature recovery time is within 5 minutes. It is equipped with HFC environmentally friendly refrigerant and binary ultra-low temperature freezing system, which has high cooling speed and efficiency. It supports paperless recording and real-time Linear dispersion display function.
The three-box structure design is adopted, the temperature conversion time does not exceed 10 seconds, the temperature control accuracy is up to +/- 0.5 ℃, the Thermal Shock test is realized through the air circuit switching, and the touch graphic operation interface is equipped to simplify the operation process.
Adopt three-box structure to achieve rapid temperature conversion, conversion time ≤ 10 seconds, temperature control accuracy of +/- 0.5 ℃, equipped with air passage switching system and microcomputer equilibrate temperature control system to ensure test Stability.
Adopting a three-box structure design, the temperature recovery time does not exceed 5 minutes, and the temperature conversion is completed within 10 seconds. It is equipped with a touch-sensitive graphic operation interface and an air path switching system to achieve fast and stable Thermal Shock testing.
Adopt three-box heat storage and cold storage structure, temperature conversion time ≤ 10 seconds, Temperature range -65 ℃~ + 150 ℃, with independent temperature control functions in high temperature zone, low temperature zone and test zone, and can perform 2-box or 3-box Impact mode.
The Three-Box structure is used to distinguish the high temperature zone, the low temperature zone and the test zone, and the air passage is switched to achieve temperature impact. The maximum cycle period is 9999 times, and the Temperature range is -60~ 150 ° C. It supports automatic cycle or manual selective impact.
The three-box structure realizes independent temperature control in the high temperature zone, the low temperature zone and the test zone. The temperature conversion time is within 10 seconds, and the temperature control accuracy reaches +/- 0.5 ° C. The air circuit switching method is used for rapid Impact testing to improve the material testing efficiency.
Adopt two-box mobile structure, air pressure drive test object Impact, Thermal Shock mechanism moving time within 10 seconds, temperature recovery time within 5 minutes, in line with MIL and other international test standards.
Using two-box mobile Impact structure, Thermal Shock mechanism moves within 10 seconds, temperature recovery time ≤ 5 minutes, equipped with rigid polyurethane foam insulation material, effective energy saving and waterproof and moisture proof.
The three-box structure is used to achieve independent temperature control in the high temperature zone, low temperature zone and test zone, with a temperature conversion time of less than or equal to 10 seconds. It is equipped with rigid polyurethane foam insulation materials and supports 2 or 3 boxes of Impact mode to meet different standard testing requirements.